Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR08-00039
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2604 W STATE ST
Project NameST MARY'S CATHOLIC CHURCH ADD.
Customer Number 
ePlanReview 
Description
Overhead sprinkelr plans. UG plans approved under FIR07-00854. Scope of Work: Overhead & Underground - St. Mary's Catholic Church Addition and Remodel - To remodel an existing 4,250 square foot, existing church building and construct a 9,750 square foot church addition on the west end of the existing church building. The addition will have a large nave, a narthex, cry room, sacristy, equipment rooms and two restrooms. The new addition is constructed of masonry and steel stud exterior walls and steel structural frame roof system. The existing church is constructed of masonry exterior walls and wood framing. This permit also includes related site improvements. This building is fully fire sprinkled. The sprinklers are used for area increase.
The under ground scope of work is to connect to an existing 6” gate valve located 35’ from the 8” main in the street. From there run 60’ of C900 out and rise up into the new addition Riser Room with 6” DI pipe. The overhead fire sprinkler scope of work includes installing a 3” wet riser and a 3” back flow device. Two separate systems will serve through out this single story Bldg. and the existing bldg. The existing bldg. consists of a lower lever and upper loft. These areas will be protected by an Anti Freeze system with up and down heads. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD07-01654 Revised Scope of Work: Overhead Only - These previously approved plans have been modified during construction. The modifications include replacing the approved back flow device with a Wilkins mod 375 RPZ. This modification did affect the anti-freeze system remote area of operation and the associated hydraulic calculation. In addition, sprinkler coverage was added in areas that were previously approved with out protection as it was noted to be non-combustible. The wet system branchline pipe sizes were changed to meet flow requirements. This modification did affect the wet pipe system remote area of operation and the associated hydraulic calculation. These modifications along with several others were noted as Delta 1 & 2, Per On-Site Conditions, dated 03/12/08 A total of 73 previously approved heads were affected by these modifications.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/9/20093/9/20093/9/2009PPASS
DetailsForrest France
Corrections completed, fire sprinkler permit finaled.
INSP-Final Inspection2/5/20092/6/20092/6/2009ANH
DetailsForrest France
Ryan is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus
INSP-Final Inspection2/4/20092/5/20092/5/2009APART
DetailsForrest France
Need as-built plans prior to permit final.
INSP-Final Inspection1/9/20091/12/20091/12/2009PFAIL
DetailsForrest France
Four missing escutcheons, basement level storage room 001 has not been sprinklered.
INSP-Sprinkler Rough-in/Hydro12/5/200812/5/200812/5/2008PPART
DetailsForrest France
Rough-in okayed for cover.
INSP-Sprinkler Rough-in10/16/200810/17/200810/17/2008PPART
DetailsForrest France
Previous c/n items for the overhead rough-in have been corrected, install is okay for cover when main tie-ins have been finished.
INSP-Sprinkler Rough-in/Hydro10/16/200810/16/200810/16/2008APART
DetailsForrest France
Hydrostatic test for the wet and antifreeze systems east remodel area syst. #2 completed acceptable.
INSP-Sprinkler Rough-in/Hydro10/14/200810/15/200810/16/2008PFAIL
DetailsForrest France
Need to add coverage at one closet and adjust spacing at one location in the attic-see plans for annotations.
INSP-Final Inspection5/27/20085/27/20085/27/2008PNR
DetailsForrest France
Permit work is not yet completed for final approval, system riser #2 feeding the east remodel is not in service as rough-in is not finished, riser #1 supervisory and alarm system interconnection tested okay-fire sprinkler install for work completed to date for "phase 1" appears acceptable.
INSP-Final Inspection5/22/20085/23/20085/23/2008ACANC
DetailsForrest France
Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Overbooked, inspection rescheduled per phone call to contractor.
INSP-Sprinkler Rough-in/Hydro4/3/20084/4/20084/4/2008ADONE
DetailsForrest France
Overhead hydro completed, passed.KR
INSP-Sprinkler Rough-in3/28/20083/31/20083/31/2008ADONE
DetailsForrest France
OK to cover in mens and womans restrooms.Changes complete per Forrest last inspection. KR
INSP-Sprinkler Rough-in3/26/20083/27/20083/27/2008AFAIL
DetailsForrest France
One upright head at the womens restroom is blocked by adjacent ductwork, one ssu at the mens restroom is obstructed by the top joist cord which extends below and directly next to the deflector, missing EQ brace at the last piece of main. Areas approved for cover include the hall 116, sacristy 115, and the narthex entry 101-see stamped plans for initialed locations. Also verified resubmittals match installation at areas where field modifications were done.
INSP-Sprinkler Rough-in/Hydro3/3/20083/4/20083/4/2008AFAIL
DetailsForrest France
Provide plan resubmittals reflecting field modifications and installation of CPVC piping for several branchlines.