INSP-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit approved for final status.
|
INSP-Final Inspection | 9/14/2009 | 9/14/2009 | 9/15/2009 | P | NR |
Forrest France
|
|
|
Work incompleted on correction notice items.
|
INSP-Final Inspection | 8/12/2009 | 8/14/2009 | 8/14/2009 | A | FAIL |
Forrest France
|
|
|
See stamped plan set for locations in need or revision including overspaced heads at the kitchen 103, one overspaced head at the basement hallway, one blocked upright at a closet 1st floor, need to provide access to three locked rooms and the elevator pit, one sw head at the stairway needs the travel cap removed, escutcheons missing at three heads.
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Troy Cobbley
|
|
|
Hydro Test Passed for wet and AnitFreeze
|
INSP-Sprinkler Rough-in/Hydro | 2/20/2009 | 2/23/2009 | 2/23/2009 | A | FAIL |
Troy Cobbley
|
|
|
Hydro test was not even started due to the fitter finding a leak.
|
INSP-Final Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | NR |
Forrest France
|
|
|
casey - please call 1/2 hr prior Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/21/2009 | 1/22/2009 | 1/22/2009 | P | PART |
Forrest France
|
|
|
Verified resubmitted plans for installation changes at the 1st floor area funsten house, okay for ceiling cover as initialed and annotated with today's date, noted flex couplings to be provided at the floor penetration for the 4" main.
|
INSP-Sprinkler Rough-in | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | FAIL |
Forrest France
|
|
|
On site visit to confirm notes per last inspection completed 8/19. Dry upright sprinkler coverage is overspaced or missing at several locations, noted several field modifications which will necessitate resubmitted plans matching the installation.
|
INSP-Sprinkler Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Forrest France
|
|
|
Chris- call 30 min prior to going to meet Phone #: ###-#### No access yet provided to inspect dry uprights as noted per last site visit completed 8/19, inspection rescheduled per phone conversation.
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Resubmittals are needed showing the upright heads being changed to pendant heads, added upright heads in the daycare/remote area, and all of the added pendants in the closets. The entire space above the ceiling, in the daycare, will need to be covered with sprinklers or a code based solution provided. Access shall be provided to view the dry upright sprinkler heads. The uprights have been deleted from the corridors but there is exposed wood above the ceilings in the corridors. Reducing fittings have been used and are not allowed per NFPA 13 unless the exception is met.
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2008 | 6/12/2008 | 6/12/2008 | P | NR |
Forrest France
|
|
|
Jerry Phone#: ###-####
|
INSP-Sprinkler Rough-in | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | PART |
Troy Cobbley
|
|
|
This inspection was for the installation of the 4" PIV. The PIV can be covered. I let the contractor know that it would be a good idea to get the conduit for the tamper switch installed prior to bury.
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | FAIL |
Forrest France
|
|
|
See approved plan set for attic area clouded per inspection completed today-noted one hanger at the 4" main to be reattatched, one missing hanger, and one upright head blocked by and adjacent truss web.
|
INSP-Sprinkler Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | NR |
Forrest France
|
|
|
jerry Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/1/2008 | 5/1/2008 | 5/5/2008 | P | PART |
Forrest France
|
|
|
OH fire sprinkler okayed for cover at the hard lid intermediate landing adjacent to the east stairway.
|
INSP-Sprinkler Rough-in | 4/15/2008 | 4/15/2008 | 4/16/2008 | P | PART |
Forrest France
|
|
|
See approved plans for hard lid restroom areas at the basement okayed for cover.
|
INSP-Sprinkler Rough-in | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Forrest France
|
|
|
Ok to cover main entance of Bishop tuttle house room# 109 stairwell.KR
|
INSP-Conference | 4/1/2008 | 4/1/2008 | 4/1/2008 | P | DONE |
Troy Cobbley
|
|
|
Jerry wanted to know precedures for getting some of the sprinkler piping covered. I notified him we could do partial rough-in sprinkler inspections.
|