INSP-Final Inspection | 3/20/2009 | 3/23/2009 | 3/23/2009 | A | PASS |
Forrest France
|
|
|
Recieved NFPA 72 documents per request, resubmittals verified, fire alarm permit finaled.
|
INSP-Alarm Testing | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PART |
Forrest France
|
|
|
Remainder of fire alarm testing completed satisfactory, noted corrections have been finished, elevator, FACP, balance of notification, etc. all tested okay. Final pending one SD for door release at the trash room level P1 to be tested (missing power to overhead door), and provision of resubmittal plans for field modifications including added ID detectors, hoistway devices, deleted points, accurate matrix, etc. as discussed.
|
INSP-Alarm Testing | 2/18/2009 | 2/19/2009 | 2/19/2009 | P | PART |
Forrest France
|
|
|
One damper 6th floor and two dampers 1st floor need repair, notification and unit smoke alarms 1st thru 6th floors tested acceptable, noted corrections made, verified signals sent from previous inspection, see plans for red line annotations on adjustments to be done.
|
INSP-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PART |
Forrest France
|
|
|
Sprinkler system interconnections to the fire alarm panel for trouble, supervisory, and alarm conditions completed satisfactory.
|
INSP-Alarm Testing | 2/16/2009 | 2/17/2009 | 2/18/2009 | P | PART |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Gobler
|
INSP-Alarm Testing | 2/12/2009 | 2/13/2009 | 2/13/2009 | A | PART |
Forrest France
|
|
|
Walkthrough completed at all floor levels, see plan annotations for areas in need of correction.
|
FIR-Aging Inspection | 6/2/2008 | 6/2/2008 | 6/2/2008 | | DONE |
Forrest France
|
|
|
Work in progress, under construction.
|