INSP-Final Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | PASS |
Forrest France
|
|
|
Balance of fire alarm permit work passed site inspection, permit finaled.
|
INSP-Final Inspection | 12/16/2008 | 12/17/2008 | 12/16/2008 | A | CANC |
Forrest France
|
|
|
mike Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
INSP-Alarm Testing | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | NR |
Forrest France
|
|
|
Phase two building construction is not yet complete.
|
INSP-Alarm Testing | 5/28/2008 | 5/29/2008 | 5/29/2008 | P | PART |
Forrest France
|
|
|
Listed correction notice items verified for compliance, permit final pending completion of phase two remodel work at the east side including notification appliances and riser #2 alarm and supervisory conditions.
|
INSP-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | FAIL |
Forrest France
|
|
|
Provide as-built plans indicating field change in notification circut wire guage from 14 to 18, the deletion of a duct smoke detector at the electrical room and the additon of a requried notification appliance at the basement storage room per review notes, provide an updated map at the panel, the door to the FACP room needs signage, sprinkler system riser #2 is not in service to complete testing, annotated areas not finished at this time including phase 2 appliance circut, central station account information is not correct regarding type and description of signals recieved-will need to retest.
|
INSP-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | CANC |
Forrest France
|
|
|
mike Phone #: ###-#### Overbooked, inspection rescheduled as agreed with sub and general contractors.
|