INSP-Final Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler permit finaled.KR
|
INSP-Final Inspection | 10/13/2008 | 10/14/2008 | 10/14/2008 | P | CANC |
Troy Cobbley
|
|
|
Final Inspection - Contact: Todd Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2008 | 9/11/2008 | 9/11/2008 | A | PASS |
Troy Cobbley
|
|
|
Forward Flow Test passed
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2008 | 9/8/2008 | 9/8/2008 | A | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping above the lay-in ceilings can be covered.
|
INSP-Supply line flush | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | PASS |
Troy Cobbley
|
|
|
OH Hydro Passed
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | PASS |
Troy Cobbley
|
|
|
See the approved plans for locations where the sprinkler piping above the hard lids can be covered.
|
INSP-Sprinkler Rough-in | 7/17/2008 | 7/18/2008 | 7/18/2008 | P | PASS |
Troy Cobbley
|
|
|
The overhead rough-in inspection passed.
|
FIR-Aging Inspection | 6/26/2008 | 6/26/2008 | 6/26/2008 | | DONE |
Forrest France
|
|
|
Site visit confirmed construction underway, work in progress.
|