Permit Information
Permit NumberFIR08-00210
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 2083 E HOSPITALITY LN
Project NameSt. Lukes Family Health
Customer Number 
ePlanReview 
Description
Work Scope: OH - Beginning from an existing supply 6” supply located within a 1 hour rated riser room at the North West corner of the bldg. install a 4” wet riser and wet pipe grid system to serve through out the entire bldg. The system is designed to Light Hazard through out the office and Exam rooms. The Underground was approved under a separate permit FIR08-00182
This permit is attached to BLD07-02854 & BLD07-03136. St. Lukes Family Health at Hospitality Lane (Shell Only) - To construct a new 9,260 square foot, one story, wood framed medical office building and related site improvements. This shell building will have two future tenant spaces. A 6,965 square foot medical office tenant space is being constructed on the east side of this building under BLD07-03137. The second tenant space, on the west to be finished at a future date under a separate permit. This is a shell permit only and no occupancy is allowed under this permit. All construction per the approved plans and attached comment list.
The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground was previously approved under separate permit # FIR08-00148.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/25/20087/25/20087/28/2008PPASS
DetailsForrest France
Shell fire sprinkler permit okay for final.
INSP-Final Inspection7/21/20087/23/20087/23/2008PNR
DetailsForrest France
Final pending completion of fire alarm interconnections for riser supervision.
INSP-Sprinkler Rough-in/Hydro7/21/20087/22/20087/22/2008PPART
DetailsForrest France
OH hydrostatic retest passed.
INSP-Sprinkler Rough-in/Hydro6/27/20087/1/20087/1/2008AFAIL
DetailsForrest France
Overhead hydrostatic test failed due to start pressure below 200 psi. (guage @ 176 psi).