Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR08-00279
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3395 S FEDERAL WAY
Project NameWALGREENS
Customer Number 
ePlanReview 
Description
BLDG. Scope of Work:
Walgreens - To construct a new 14,150 square foot, one story, wood framed retail drug store with pharmacy, one hour photo processing, storage area and restrooms. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Scope of Work:
Shilo scope will begin from the existing 6” UG Gate valve and section and section of 6” C900 located 15’ onto the property line, from there, run out through a PIV and 165 lf. of 6” C900. Then rise up into the riser room of a new 14’150-ft/2 bldg. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD07-03219. The overhead will be submitted under a separate permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/200810/14/200810/14/2008PPASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Final Inspection10/13/200810/14/200810/13/2008ACANC
DetailsForrest France
Richard Clark is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Conference10/7/200810/8/200810/8/2008PDONE
DetailsForrest France
Conference regarding attatched outside storage area. See NFPA 13 2007 8.15.7.5 regarding coverage at areas below exterior canopies.
INSP-Conference10/7/200810/8/200810/7/2008PCANC
DetailsForrest France
Mike Bierman is the contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro8/20/20088/20/20088/20/2008PPASS
DetailsForrest France
Under ground hydro passed. KR
INSP-Supply line flush8/18/20088/19/20088/19/2008APART
DetailsForrest France
UG fire supply line flush completed.
INSP-Sprinkler Rough-in8/18/20088/19/20088/19/2008ADEFR
DetailsForrest France
Duplicate inspection request.
INSP-Supply line flush8/15/20088/18/20088/18/2008ACANC
DetailsTroy Cobbley
Need to cancel per Josh Phone #: ###-####
INSP-Sprinkler Rough-in5/12/20085/13/20085/13/2008APART
DetailsForrest France
UG fire supply line is approved for cover from the PIV to the ductile riser stub.