INSP-Final Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | FAIL |
Troy Cobbley
|
|
|
Shell permit needs finaled first. This TI permit is ok to final when that happens.
|
INSP-Sprinkler Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PART |
Troy Cobbley
|
|
|
This inspection was for a first floor rough-in. The sprinkler piping can not be covered yet since final locations for the pendants is not done. No t-bar has been installed yet. The rough-in for the most part is ok. Two items have been noted. They include most of the branchline hangers to the north of the 3" main have been attached to the bottom of the beams. I referenced note #50 which does not allow this. Also the sidewall head installed at the top of the elevator shaft has not been installed in the 4" to 6" window.
|
INSP-Sprinkler Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | PART |
Forrest France
|
|
|
See stamped TI plan set for rough-in areas approved for cover at the hard lid ceilings including soffits, noted head placement to be adjusted at the conference room accordian door pocket for proper coverage, ceiling at the electrical closet appears to have been deleted-if so then walls must extend to the bottom of the deck for area separation of sprinklered and non-sprinklered spaces.
|