Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR08-00322
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 300 N MILWAUKEE ST
Project NameJC PENNY
Customer Number 
ePlanReview 
Description
FIR Work Scope: The Fire Sprinkler scope consists of adding and relocating 27 heads to accommodate a new wall & ceiling lay out. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-00434.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/16/20089/16/20089/17/2008PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro8/25/20088/26/20088/26/2008APASS
DetailsTroy Cobbley
Permit finaled.
INSP-Sprinkler Rough-in/Hydro7/28/20087/28/20087/28/2008PFAIL
DetailsTroy Cobbley
Per Vance the approved plans are missing. Terry is going to get replacement plans and the inspection will be called back in. No inspection was performed.