Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR08-00331
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1122 N LIBERTY RD
Project NameApollo College
Customer Number 
ePlanReview 
Description
Scope of Work: UG Only
Shilo scope will begin from the existing 6” UG Gate valve and section and section of 6” C900 located 15’ onto the property line, from there, run out 54 lf. of 6” C900. Then rise up into the riser room of a new 23,550-ft/2 two story bldg. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD08-00234. The overhead will be submitted under a separate permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/14/20094/14/20094/14/2009PPASS
DetailsTroy Cobbley
permit finaled
INSP-Supply line flush11/18/200811/18/200811/18/2008PDONE
DetailsForrest France
Underground flush completed.KR
INSP-Supply line flush11/17/200811/18/200811/18/2008ANR
DetailsForrest France
Water supply not available at the time of inspection, to be rescheduled as discussed.
INSP-Sprinkler Rough-in10/15/200810/20/200810/15/2008ACANC
DetailsTroy Cobbley
Charles Lamb is your contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro10/1/200810/1/200810/1/2008PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Sprinkler Rough-in9/4/20089/5/20089/5/2008APASS
DetailsTroy Cobbley
The underground supply piping is ok to cover.
INSP-Sprinkler Rough-in6/11/20086/12/20086/13/2008APART
DetailsTroy Cobbley
The stub out from the building to 10' out is ok to cover. Piping as installed is 6" and matches what is shown on the plans.