INSP-Final Inspection | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | NR |
Forrest France
|
|
|
Pending request for building permit final fire life safety inspection-will complete sprinkler final in conjunction per discussion with general contractor.
|
INSP-Final Inspection | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | FAIL |
Forrest France
|
|
|
Project is not ready for final at this time due to finishes and construction underway-missng escutcheons, paint masking, etc.
|
INSP-Sprinkler Rough-in | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PART |
Forrest France
|
|
|
Approved for ceiling cover as noted, existing system riser is current with an annual inspection.
|
INSP-Sprinkler Rough-in | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications are okay for ceiling cover at the remodel area.
|