Description
FIR Sprinkler Scope:
Install a new 13D approved multi purpose piping system (Uponor , Wirsbo ) fire sprinkler system through out the two story multi family dwelling to include coverage in the closets. System shall be equipped with an alarm initiating device and an outside alarm. The system will be supplied from an existing 2” poly dedicated fire line. (by others) All fire sprinkler work and related, which includes a single dedicated service water supply, the system (provided by others), shall be per NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to BLD08-00361.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/25/20088/26/20088/26/2008APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection8/21/20088/22/20088/22/2008AFAIL
DetailsForrest France
Need to provide inspectors test connections per NFPA 13D 2007 7.2.4 and 7.2.5.
INSP-Final Inspection8/18/20088/19/20088/19/2008PFAIL
DetailsForrest France
Provide "911" signs at the outside bells, noted light fixture obstructions at some locations, provide missing head boxes and stock of spare sprinklers, secure signage at the control valve for the north unit, need to complete alarm bell testing, provide plans and review notes on site for verification of conditions met at next inspection, missing NFPA 25's.
INSP-Sprinkler Rough-in6/16/20086/16/20086/16/2008APART
DetailsForrest France
OH rough-in okayed for cover as indicated for units one, two and three, first and second floors.
INSP-Sprinkler Rough-in6/10/20086/11/20086/11/2008PPART
DetailsForrest France
Corrections listed at the previous inspection are finished, overhead rough-in is approved for cover.
INSP-Sprinkler Rough-in/Hydro6/9/20086/10/20086/10/2008AFAIL
DetailsForrest France
Sprinkler heads at each first floor unit under the stairways are overspaced, 2nd floor mid unit hallway head needs relocated due to overspacing, remainder of flow testing passed, tenting at the attic spaces is satisfactory.
INSP-Sprinkler Rough-in6/6/20086/9/20086/9/2008ACANC
DetailsTroy Cobbley
dave Phone #: ###-####
INSP-Sprinkler Rough-in6/5/20086/6/20086/6/2008AFAIL
DetailsForrest France
The second floor middle and left end units have been sheetrocked prior to overhead rough-in inspection, completed satisfactory flow testing and OH inspection for the right side unit 1st and 2nd floors, noted missing flow switch and outside bell at all units, discussed shoutoff valve signage and head box placement.