Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR08-00397
StatusFinaled
Name AUDIO ELECTRONICS INC
Site Address 9050 W OVERLAND RD Unit: 100
Project NameBROWN MACKIE COLLEGE T.I.
Customer Number 
ePlanReview 
Description
This fire alarm permit is to install notification devices and duct detectors due to a tenant improvement that will cover a portion of the 1st and the entire 2nd floor. The shell was approved under permit number FIR06-00507 which included the sprinkler monitoring, shell notification, and elevator recall functions.

08-12-08 PLAN MODIFICATION: additional notification devices were provided due to full height walls being added, some minor circuiting changes in the field, a candela increased due to mounting issues, and based on field inspection door holders were added.

08-18-08 PLAN MODIFICATION: Added a remote power supply and re-landed existing circuits (as-is) onto the new remote power supply NACs due to synchronization problems.

Associated building permit: BLD08-00984 (BROWN MACKIE COLLEGE - ANDERSON BLACK EAGLE BLDG -1ST & 2ND FLRS) To construct a 25,612 sq.ft. medical education facility covering areas on 2 stories (14,672 s.f. 1st / 10,940 s.f. 2nd) of an existing shell building per approved plans and CUP08-00056. Work includes select interior demolition, construction of non-combustible framed walls to create instruction & demonstration/practice classrooms & labs; administrative office's and support areas; study/library, student lounge, accessible restrooms and accessible elements throughout; suspended ACT & sheetrock ceilings; electrical, mechanical, plumbing, sprinkler & alarm systems work; millwork and finishes throughout. Drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/21/20088/21/20088/21/2008PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection8/12/20088/13/20088/13/2008AFAIL
DetailsTroy Cobbley
All of the previous deficiencies have been corrected. Once we were able to test the audio/visual devices we found that the second floor horns are not syncronized as required per NFPA 72 - 6.8.6.5.3. The duct smoke detectors tested ok.
INSP-Final Inspection8/8/20088/11/20088/11/2008AFAIL
DetailsTroy Cobbley
The job site approved plan set was not on the job site. A strobe in the first floor area as marked on the plans is blocked by walls. There are many strobes on the second floor that are overspaced. The fire alarm contractor needs to review the spacing on all of the second floor strobes for code compliance. I pointed out a note on the review comments about the minimum voltage allowed from the fire alarm panel that is to be verified prior to my next inspection. Also plans need to be resubmitted showing the door magnets (access controlled egress doors) and their interconnection to the FACP. Basically no testing was performed.
INSP-Final Inspection8/7/20088/8/20088/8/2008PCANC
DetailsTroy Cobbley
Troy, Please call as soon as you know an approximate time. Thank You. Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick