INSP-Final Inspection | 10/8/2008 | 10/8/2008 | 10/8/2008 | P | PASS |
Troy Cobbley
|
|
|
Corrections made per Forrest last inspection and forward flush completed. KR.
|
INSP-Final Inspection | 10/3/2008 | 10/6/2008 | 10/6/2008 | A | CANC |
Forrest France
|
|
|
Bruce Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/23/2008 | 9/24/2008 | 9/24/2008 | A | PART |
Forrest France
|
|
|
Verified correction notice items are complete per last inspection, pendent heads at the paint mixing room are the correct type however plan legend indicates 286 deg. heads and 155 deg. heads have been installed. Also need to adjust deck insulation blocking one upright head prior to final. Office areas are okay for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | FAIL |
Forrest France
|
|
|
OH rough-in failed due to missing SW head at an overhead door, blocked upright by deck insulation, incorrect head types at the paint storage and mixing room, overspaced pendent at the dry goods storage room, need to install flex couplings at the riser per key note #16 on plans. See annotations on stamped plan set.
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing passed inspection, noted FDC is obstructed as installed by adjacent bollard at the garage door entrance. Need approved plans for rough-in inspection.
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2008 | 9/8/2008 | 9/5/2008 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|