Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR08-00528
StatusFinaled
Name ALLIED GENERAL FIRE & SECURITY
Site Address 2796 S VICTORY VIEW WAY
Project NameVIC PARK BUILDING #3
Customer Number 
ePlanReview 
Description
This fire alarm permit is to add a new duct detector to the existing fire alarm system.

Associated building permit: BLD08-01357 (CORPORATE EXPRESS - VIC PARK BLDG #3) Permit to construct a 5,943 square foot warehouse with office and mercantile. Work to include: [Construction of interior non-bearing partition walls to create an office, a storage room, a drivers room, a conference room, and separate sex accessible restrooms,] new doors in specified locations, install new H-VAC system including ducts and diffusers, new plumbing, new electrical, install a new steel guard rail, install a new stairwell at back of warehouse, and installation of interior finishes in compliance with chapter 8 of the IBC. This building is sprinklered for area increase any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be maintained as regulated by the fire department in accordance with NFPA 13 standards. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. Any storage racking over 8 ft. in height will require a separate permit. **TLW**

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/22/20088/22/20088/22/2008PPASS
DetailsTroy Cobbley
Permit finaled. I had the technician change the zone label from the tenant name to the tenant address.
INSP-Final Inspection8/20/20088/21/20088/21/2008AFAIL
DetailsTroy Cobbley
The sample tubes have been corrected but we could not test the duct smoke detector since the gas had not been piped to the hvac unit.
INSP-Final Inspection8/20/20088/20/20088/20/2008PFAIL
DetailsTroy Cobbley
The new duct smoke detector had not been wired to the facp yet and the monitoring company had not been set up for the new zone. Also the plastic sample tube in the duct smoke detector needed to be removed and the steel tube put in its position. No inspection was performed for function.