Permit Information
Permit NumberFIR08-00541
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 3604 S BANNER AVE
Project NameSTEVE CHRISTENSEN BLDG
Customer Number 
ePlanReview 
Description
Revised FIR Work Scope: 10/19/08
The contractor has submitted calculations and plans with modifications to include accurate plan revisions, notations and dates. The system design was modified during construction due to inaccurate original water flow information having been calculated. Among the modifications are pipe size and layout, new heads with a lower k-factor and a hard lid was added in the open area above the warehouse.
Revised FIR Work Scope: 09/29/08
The contractor has submitted plans with modifications to include pipe type changes to the mezzanine piping from steal to CPVC. The original head count has been changed to include additional heads. New total count is noted to be 163.
FIR Work Scope:
Beginning from an existing 6” supply flange located at the South end of the bldg. install a 4” wet riser and wet pipe system to serve through out the entire bldg. including the attic space. The system supply will be controlled from a wall post indicating valve. The system is designed to Ordinary Group II for shell protection of the Warehouse space and light hazard in the Office space.
The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-02372 & UG FITR08-00434.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/21/20091/22/20091/22/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/21/20091/21/20091/21/2009PFAIL
DetailsTroy Cobbley
The forward flush passed. Bruce needs to change the mixed temperature pendants to be all 155 degree except in locations as required
INSP-Final Inspection1/15/20091/16/20091/16/2009PCANC
DetailsTroy Cobbley
The project related fire alarm is not complete so bruce and I agreed to reschedule for next week.
INSP-Sprinkler Rough-in10/24/200810/24/200810/24/2008PPASS
DetailsTroy Cobbley
The overhead sprinkler piping can be covered.
INSP-Sprinkler Rough-in8/28/20088/29/20088/29/2008APART
DetailsTroy Cobbley
The above ground hydro test passed but the rough-in inspection failed due to cpvc piping being installed under the mezzanine instead of the steel piping as per the plans and hydraulic calculations.
INSP-Sprinkler Rough-in/Hydro8/28/20088/28/20088/28/2008PPASS
DetailsTroy Cobbley
The underground flush passed.