INSP-Final Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2008 | 9/15/2008 | 9/15/2008 | A | PART |
Forrest France
|
|
|
See stamped plan set for locations approved to date.
|
INSP-Sprinkler Rough-in | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | PART |
Forrest France
|
|
|
Overhead installation at the grid ceiling is good for cover, atrium work is not finished.
|
INSP-Sprinkler Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Forrest France
|
|
|
Fire sprinkler work above hard lid ceilings is approved for cover, atrium and grid ceiling sprinkler work is not yet complete.
|
INSP-Sprinkler Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 | A | PART |
Forrest France
|
|
|
OH fire sprinkler system modifications are okay for cover at the womens and mens locker room sheetrock ceiling areas-circled and initialed on stamped plans with today's date, also verified coverage outside remodel area due to new wall construction is compliant.
|