INSP-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | A | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | PART |
Forrest France
|
|
|
Completed elevator testing at builidngs 2 and 3, finished dry system riser supervision testing, DH and DD re-checked, panel items and offsite monitoring including account information verified, previous correction items retested. Final pending points map at the panel and record of completion forms.
|
INSP-Alarm Testing | 12/9/2011 | 12/12/2011 | 12/12/2011 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints.
|
INSP-Alarm Testing | 12/8/2011 | 12/9/2011 | 12/9/2011 | A | PART |
Forrest France
|
|
|
Correction items noted today include DH at building #2, three PS at the main riser, dampers at building 2 and 3 parking garage, inaccurate one line for initiating device point numbers. All SD and HD at building 1 and 4 tested okay, relocated trash chute heats at buildings 2 and 3 also tested okay.
|
INSP-Alarm Testing | 12/7/2011 | 12/7/2011 | 12/7/2011 | P | NR |
Forrest France
|
|
|
Low air pressure switches at dry systems not set, DH did not release, noted 4th floor dry system LAPS activated a general alarm condition.
|
INSP-Alarm Testing | 12/5/2011 | 12/6/2011 | 12/7/2011 | P | PART |
Forrest France
|
|
|
Completed fire sprinkler system monitoring test at both buildings # 2 and 3 throughout, verified previous corrections, noted items include; 7 PS at dry systems not set, inconsistent address/descriptors, DH at some levels failed to drop or reset, missing revised plan sheets for the 1st floor.
|
INSP-Alarm Testing | 12/2/2011 | 12/5/2011 | 12/5/2011 | A | PART |
Forrest France
|
|
|
Completed notification testing at building 1 garage, building 2 and 3 garages including 1st -4th floors and building 4 garage. Verified previous correction items and repairs at buildings 2 and 3, record drawings for field changes finished with the exception of the first floor levels. Noted items today include one non-functional av at the 2nd floor #3 corridor, insufficient dB at resident storage bldg. #3, dB levels at the finished model units are not adequate, DH at elevator lobbies building #2 did not release. Discussed schedule and items for next test date.
|
INSP-Alarm Testing | 11/28/2011 | 11/29/2011 | 11/29/2011 | A | PART |
Forrest France
|
|
|
|
INSP-Alarm Testing | 11/28/2011 | 11/29/2011 | 11/29/2011 | A | PART |
Forrest France
|
|
|
Completed initial walkthrough for scope of work at parking garages in buildings 1 and 4, and building 3 basement thru 4th floor. Also completed second walkthrough of building 2 after noted corrections made. See plan set for marked locations and annotations regarding today's inspection notes.
|
INSP-Alarm Testing | 11/27/2011 | 11/28/2011 | 11/28/2011 | A | PART |
Forrest France
|
|
|
|
INSP-Alarm Testing | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | PART |
Forrest France
|
|
|
Walkthrough completed for building #2- see plan annotations and review comments for locations and descriptions of items to be amended including appliance locations, notification coverage, etc.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2011 | 11/10/2011 | 11/9/2011 | P | DEFR |
Forrest France
|
|
|
Rob Ahten Protex Phone #: ###-#### >> Inspection requested via web by Sean DeLacy
|
INSP-Final Inspection | 11/7/2011 | 11/9/2011 | 11/9/2011 | P | NR |
Forrest France
|
|
|
Rob Ahten Protex Phone #: ###-#### >> Inspection requested via web by Sean DeLacy
|
INSP-Conference | 6/27/2011 | 6/27/2011 | 6/28/2011 | P | DONE |
Forrest France
|
|
|
Regarding plan modifications.
|