Permit Information
Permit NumberFIR08-00604
StatusFinaled
Name R M E INC
Site Address 3005 -3059 W CRESCENT RIM DR
Project NameCRESCENT RIM #2 #3-CONDOS
Customer Number 
ePlanReview 
Description
11/1/11 PLAN MODIFICATION (16 initiating devices affected): This plan modification is to include the notification and initiating devices for building #1 and building #4 mechanical rooms, electrical rooms, and exit corridors/pathways per the agreement attached to BLD06-02322 and BLD06-02324.
6/21/11:This fire alarm permit is to provide a full manual and automatic fire alarm system that includes elevator recall, notification, duct detector monitoring, and sprinkler system monitoring. NOTE: Individual units (other than audibility) will be done under separate permits associated with individual occupancy permits.
Associated building permit: BLD06-02323 (CRESCENT RIM BUILDINGS #2 & #3 - RESIDENTIAL UNITS) To construct a new 115,017 sq. ft., four story, 41 dwelling units, residential condominium building with 2 guest suites (without kitchens), located above an enclosed basement parking garage. The first floor area is 31,807 sq.ft., includes the 2 guest suites, 3 multi-purpose rooms, a residential style common area kitchen, common area storage rooms, a pool equipment room, covered guest parking area and 8 dwelling units. The second floor is 31,689 sq.ft., and is divided between 14 dwelling units. The third floor is 26,233 sq.ft. and is divided between 10 dwelling units. The fourth floor is 25,288 sq.ft. and is divided between 9 dwelling units. The 2 guest suites are less than 800 sq.ft., the remaining units in Bldg 2 & 3, each of which exceed 800 sq.ft. of floor area. Note: The installation of a NFPA 13 fire sprinkler system is required throughout this building and is used for area increase. All construction shall be per the approved plans and attached comment lists. DEFERRED SUBMITTALS AFTER PERMIT ISSUANCE REQUIRED BY STRUCTURAL ENGINEER AND FIRE. Refer to BLD06-02320 for the construction of the parking garage. MJP DRH 05-00397 CUP 04-00107
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/23/201112/23/201112/23/2011APASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Alarm Testing12/14/201112/15/201112/15/2011APART
DetailsForrest France
Completed elevator testing at builidngs 2 and 3, finished dry system riser supervision testing, DH and DD re-checked, panel items and offsite monitoring including account information verified, previous correction items retested. Final pending points map at the panel and record of completion forms.
INSP-Alarm Testing12/9/201112/12/201112/12/2011PCANC
DetailsTroy Cobbley
Cancelled due to time constraints.
INSP-Alarm Testing12/8/201112/9/201112/9/2011APART
DetailsForrest France
Correction items noted today include DH at building #2, three PS at the main riser, dampers at building 2 and 3 parking garage, inaccurate one line for initiating device point numbers. All SD and HD at building 1 and 4 tested okay, relocated trash chute heats at buildings 2 and 3 also tested okay.
INSP-Alarm Testing12/7/201112/7/201112/7/2011PNR
DetailsForrest France
Low air pressure switches at dry systems not set, DH did not release, noted 4th floor dry system LAPS activated a general alarm condition.
INSP-Alarm Testing12/5/201112/6/201112/7/2011PPART
DetailsForrest France
Completed fire sprinkler system monitoring test at both buildings # 2 and 3 throughout, verified previous corrections, noted items include; 7 PS at dry systems not set, inconsistent address/descriptors, DH at some levels failed to drop or reset, missing revised plan sheets for the 1st floor.
INSP-Alarm Testing12/2/201112/5/201112/5/2011APART
DetailsForrest France
Completed notification testing at building 1 garage, building 2 and 3 garages including 1st -4th floors and building 4 garage. Verified previous correction items and repairs at buildings 2 and 3, record drawings for field changes finished with the exception of the first floor levels. Noted items today include one non-functional av at the 2nd floor #3 corridor, insufficient dB at resident storage bldg. #3, dB levels at the finished model units are not adequate, DH at elevator lobbies building #2 did not release. Discussed schedule and items for next test date.
INSP-Alarm Testing11/28/201111/29/201111/29/2011APART
DetailsForrest France
INSP-Alarm Testing11/28/201111/29/201111/29/2011APART
DetailsForrest France
Completed initial walkthrough for scope of work at parking garages in buildings 1 and 4, and building 3 basement thru 4th floor. Also completed second walkthrough of building 2 after noted corrections made. See plan set for marked locations and annotations regarding today's inspection notes.
INSP-Alarm Testing11/27/201111/28/201111/28/2011APART
DetailsForrest France
INSP-Alarm Testing11/10/201111/14/201111/14/2011APART
DetailsForrest France
Walkthrough completed for building #2- see plan annotations and review comments for locations and descriptions of items to be amended including appliance locations, notification coverage, etc.
INSP-Sprinkler Rough-in/Hydro11/7/201111/10/201111/9/2011PDEFR
DetailsForrest France
Rob Ahten Protex Phone #: ###-#### >> Inspection requested via web by Sean DeLacy
INSP-Final Inspection11/7/201111/9/201111/9/2011PNR
DetailsForrest France
Rob Ahten Protex Phone #: ###-#### >> Inspection requested via web by Sean DeLacy
INSP-Conference6/27/20116/27/20116/28/2011PDONE
DetailsForrest France
Regarding plan modifications.