INSP-Final Inspection | 4/6/2009 | 4/6/2009 | 4/6/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. It took two visits to the job site before the inspection could be passed. At the first inspection it was found that the incorrect sample tubes for the duct smoke detectors had been installed. The correct sample tube were found, installed and verified this afternoon.
|
INSP-Alarm Testing | 4/6/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Troy Cobbley
|
|
|
It took two visits to the job site before the inspection could be passed. At the first inspection it was found that the incorrect sample tubes for the duct smoke detectors had been installed. The correct sample tube were found, installed and verified this afternoon.
|
INSP-Final Inspection | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | FAIL |
Troy Cobbley
|
|
|
The spacing of the strobes has been corrected but functionality was not tested. None of the duct smoke detectors tested shutdown upon detection of smoke. The correct orfices need to be installed in both of the fire sprinkler inspector test lines. The flow switch on the east system did not operate. The west sprinkler system flow switch was not tested. The outside alarm bell did not operate on the east sprinkler system. The sprinkler tamper switches did operate correctly.
|
INSP-Alarm Testing | 3/30/2009 | 3/31/2009 | 3/31/2009 | A | CANC |
Troy Cobbley
|
|
|
Cnceled due to time constraints
|
INSP-Alarm Testing | 3/26/2009 | 3/27/2009 | 3/27/2009 | A | FAIL |
Troy Cobbley
|
|
|
The only items tested today were the phone lines for supervision. They were programed for the supervision as I waited. The interconnect with the NAC panel was also tested. The Inspection did not proceed any further due to many of the strobes being overspaced. Spacing will need to be modified or additional strobes added. The phone line trouble signals did report to the monitoring station.
|