Permit NumberFIR08-00612
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3858 N GARDEN CENTER WAY
Project NameGarden Center
Customer Number 
ePlanReview 
Description
Revised FIR Work Scope: These plans were resubmitted due to plan modifications as a result of the original plan review comments. The revision has been noted as Rev 1 and dated 09/12/08.
FIR Work Scope: Beginning from a new 6” UG supply located in the riser room at the South East corner of the bldg. install a 3” riser with and wet system to provide shell protection through out the entire 3 story structure. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-03134.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/29/20091/29/20091/29/2009PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/27/20091/28/20091/28/2009PCANC
DetailsTroy Cobbley
The resubmitted drawings have not been approved yet.
INSP-Final Inspection1/26/20091/27/20091/27/2009AFAIL
DetailsTroy Cobbley
Per Brian Johnson the remote area #4 will not work with the two additional elbows that have been added. He is to work out a solution and meet with Tim Frost and get an approval on the solution.
INSP-Final Inspection1/26/20091/26/20091/26/2009PFAIL
DetailsTroy Cobbley
The forward flow test passed inspection. The forward flow/FDC assembley did not pass inspection and needs to be installed as per the drawings. Two 3" 90's have been installed at the base of the riser. It appears per the drawings that a very slim safety factor was acheived on remoted area #4. I need verification that the 5% requirement is still satisfied. Ceiling tile needs to be removed where additional hangers were required for the pendant heads. The third floor roof access room needs a ceiling and a pendant, walls to the deck or upright protection needs to be provided throughout the third floor attic space.
INSP-Sprinkler Rough-in/Hydro10/8/200810/10/200810/9/2008PDEFR
DetailsForrest France
Duplicate inspection request, see notes dated 10/8 and 10/9.
INSP-Sprinkler Rough-in/Hydro10/8/200810/9/200810/9/2008APART
DetailsForrest France
OH hydrostatic testing for the 1st, 2nd and 3rd floor piping completed acceptable.
INSP-Sprinkler Rough-in/Hydro10/7/200810/8/200810/8/2008PFAIL
DetailsForrest France
Lacking coverage at both the north and south stairway landings 1st floor, seismic bracing at two locations is not approved including at the riser and the 3rd floor. See locations marked on plans.