Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR08-00623
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 545 N BENJAMIN LN Unit: 155
Project Name 
Customer Number 
ePlanReview 
Description
FIR Work Scope: The Fire Sprinkler scope consists of adding and relocating 90 down head to accommodate a new wall & ceiling layout. This modification does not appear to adversely affect the operation of the system The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-01853.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/29/200810/29/200810/29/2008PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in10/3/200810/3/200810/3/2008PPASS
DetailsTroy Cobbley
The sprinkler rough-in is ok but the sprinkler piping can not be covered until the insulation that is hanging from the deck and blocking the upright sprinklers has been repaired and verified by an inspection.