Permit Information
Permit NumberFIR08-00679
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 1072 N LIBERTY ST
Project NameST ALPHONSUS-MOB #7
Customer Number 
ePlanReview 
Description
5-20-09: PLAN MODIFICATION
This plan modification is to indicate addressable notification devices (as opposed to the standard shown on the original submittals), to implement changes due to the previous review comments, to remove the heat and smoke detection in the elevator shaft (a sprinkler head in the shaft was not installed), revision of monitored sprinkler devices, and addition of a heat detector in the elevator mechanical room. Also included in this modification are the correct data sheets for the LCD annunciator and smoke detectors (previously submitted on incompatible parts for these devices.)
___________________________________________________________________________________


10-13-08:
This fire alarm permit is to provide a new FACP for sprinkler monitoring, elevator recall, duct detectors, and a manual fire alarm system for the core and shell of the new building. System to include manual pull stations and notification in the common corridors. Audible notification has been provided in specified rooms; however visual notification and smoke detection shall be added during future tenant improvements under separate permits.

Associated building permit: BLD08-01210 St. Alphonsus - MOB VII shell & core building - To construct a new 70,705 square foot, three story, steel frame and concrete medical office shell and core building related site improvements. The core areas include stair enclosures, elevators, mechanical and electrical rooms and entry lobby. This building is fully fire sprinkled. The sprinklers are used for area increase. Any I-2 Occupancies would be limited to the first floor and must be separated from the remainder of the building by minimum one-hour fire-barriers. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/25/20095/26/20095/26/2009APASS
DetailsTroy Cobbley
Permit finaled. The address has been changed from Hartman to Liberty.
INSP-Final Inspection5/21/20095/21/20095/21/2009PFAIL
DetailsTroy Cobbley
All items have been tested except the elevator recall/voltage monitoring interconnections.
INSP-Final Inspection5/19/20095/20/20095/20/2009ACANC
DetailsTroy Cobbley
See yesterdays entry for details.
INSP-Alarm Testing5/19/20095/19/20095/19/2009PFAIL
DetailsTroy Cobbley
Resubmittals are required due to addressable notification devices installed instead of the standard devices. Also the smoke detectors model shown on the plans is not what has been installed. The initiating devices in the elevator shaft have been deleted per the state elevator inspector per brian with simplex. As-builts were on site but did not match the installation. The strobes on the second floor exterior balcony need modified to provide correct coverage. The manual pull station in the first floor lobby is mounted too high. The items tested that passed are phone lines, battery trouble, loss of a/c and the smoke detector over the facp. These signals were received at the central station. I request a manometer test of the duct smoke detectors on the first floor due to questionable positioning in the ducting.
FIR-Aging Inspection1/13/20091/13/20091/16/2009 NR
DetailsTroy Cobbley
Work is in progress