INSP-Final Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | PASS |
Troy Cobbley
|
|
|
Per phone call with Troy ok to pass final inspection
|
DOC - Permit Finaled | | | 10/31/2008 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
The sidewall head is mounted too far off of the wall and the backflow preventor needs to be certified. Per the sprinkler contractor a standard sidewall was going to be installed and a heat vent installed in this room to keep the temp above 40 degrees.
|