INSP-Final Inspection | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PART |
Forrest France
|
|
|
OH fire sprinkler rough-in is acceptable, noted items repaired.
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | PART |
Forrest France
|
|
|
New piping and heads at the sheetrock ceilings are okay for cover, noted two existing upright heads in need of replacement due to paint on the elements and frames.
|