Permit Information
Permit NumberFIR08-00772
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1085 N MILWAUKEE ST
Project NameJoAnn Fabric and Crafts
Customer Number 
ePlanReview 
Description
FIR OH Work Scope:
The fire sprinkler scope consists of raising the 2.5” cross mains and 1.25” branchlines as noted on the plan. The contractor will also remove the existing drops / pendant head protection as noted on the reference sheet and replace them with 193 quick response SSU heads on sprig ups. The fire sprinkler system work shall comply with the IFC 2006, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to BLD08-02320.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/9/20103/9/20103/9/2010PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection2/3/20092/4/20092/4/2009PPART
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro2/3/20092/4/20092/4/2009PPASS
DetailsTroy Cobbley
The above ground hydro test passed.
INSP-Final Inspection1/29/20092/2/20092/2/2009AFAIL
DetailsTroy Cobbley
Provide hydro testing per NFPA 13 and 25. Provide data sheets for the newly installed valve on the backflow preventor. Provide as-builts.
INSP-Sprinkler Rough-in1/14/20091/15/20091/15/2009PFAIL
DetailsTroy Cobbley
Remove 1" valve or provide tamper switch on the valve controlling water to the elevator shaft. The upright sprinklers along column line "D" are overspaced by being 8'-0" off of the column line/roof deck transition. The tamper switch on the backflow preventor does not meet the requirements of NFPA 72. Several sprinkler pendants on the second floor are located too close to the supply registers. Standard responce upright heads have been mixed with new quick responce heads over the sales floor. Earthquake bracing is missing on the 4" main. An additional pendant head is needed in the first floor storage room. Provide sprinkler coverage under the landing at the west stairs.
INSP-Conference11/25/200811/26/200811/26/2008ACANC
DetailsTroy Cobbley
Cancel per Mike