INSP-Final Inspection | 8/14/2009 | 8/20/2009 | 8/21/2009 | A | PASS |
Forrest France
|
|
|
The remainder of fire alarm system testing passed per inspection by S. Cobbley, fire alarm permit approved for final.
|
INSP-Final Inspection | 8/14/2009 | 8/21/2009 | 8/21/2009 | A | CANC |
Forrest France
|
|
|
We would like to continue the inspection on this school this morning, and then continue through the rest of the week at approximately the same time if that will work. Thank you, Jason ###-#### Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|
INSP-Final Inspection | 8/14/2009 | 8/19/2009 | 8/20/2009 | A | PART |
Forrest France
|
|
|
See comments per inspection completed by S. Cobbley including areas A, B, D, correction items and adjustments to date.
|
INSP-Final Inspection | 8/14/2009 | 8/18/2009 | 8/19/2009 | A | PART |
Forrest France
|
|
|
Fire alarm testing for area "B" completed including correction notice items and notification throughout. Correction items from this inspection include two missing smoke detectors at the open junction boxes on the sloped ceiling in the cafeteria, provide notification for the modified floorplan at a classroom area "A" as noted, one SD at the corridor area A north end has not been relocated, switched addresses at two smoke detectors, sprinkler monitoring okayed.
|
INSP-Final Inspection | 8/14/2009 | 8/17/2009 | 8/18/2009 | A | FAIL |
Forrest France
|
|
|
See red line annotations on stamped plan set for locations of items in need of adjustment per on site discussion and jobsite walkthrough.
|
FIR-Aging Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 | | DONE |
Forrest France
|
|
|
Work in progress, construction underway.
|