INSP-Final Inspection | 5/12/2009 | 5/12/2009 | 5/13/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. I spoke to the fire sprinkler contractor about some newly installed curtain tracks that have the potential to block the pendant sprinkler coverage. This would have the potential to hold up the live safety inspection sign off.
|
INSP-Sprinkler Rough-in/Hydro | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/7/2009 | 4/9/2009 | 4/9/2009 | A | PART |
Troy Cobbley
|
|
|
The overhead hydro test failed but the overhead sprinkler piping can be covered. The overhead hydro is set back up for this afternoon.
|
INSP-Sprinkler Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PASS |
Troy Cobbley
|
|
|
Rough-in inspection passed. See the city approved plans for locations of corrections needed. The hard lid areas are ok to cover.
|