INSP-Final Inspection | 7/28/2009 | 7/29/2009 | 7/30/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/11/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test including the fdc passed
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2009 | 5/6/2009 | 5/6/2009 | A | PART |
Troy Cobbley
|
|
|
Both of the above ground hydro tests failed. The wet system had visable leakage on the mezzanine. The FDC was not part of the hydro test and wil need to be included as per NFPA 13. The corrections noted on the previous inspection have been corrected and the remaining piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints.
|
INSP-Sprinkler Rough-in | 4/17/2009 | 4/20/2009 | 4/20/2009 | P | PART |
Troy Cobbley
|
|
|
Seven upright heads need to be added as marked on the city approved plans. One piece of sprinkler piping on the plans has no designation and 4" piping has been installed where 3" is shown on the plans. Sprinkler piping can be covered except where these problems are located.
|
INSP-Sprinkler Rough-in | 2/27/2009 | 2/27/2009 | 3/2/2009 | P | PASS |
Troy Cobbley
|
|
|
Ok to Cover Foyers on the first floor but not outside the foyers which are protected from the above systems. Ok to Cover Rooms 150 and 151, and bathrooms on First Floor.
|
INSP-Sprinkler Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per the fire sprinkler contractor.
|
INSP-Sprinkler Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | FAIL |
Troy Cobbley
|
|
|
Resubmittal of drawings required. Drawings do not match installation. Antifreeze system was installed instead of the dry system that was shown on the plans.
|