INSP-Sprinkler Rough-in/Hydro | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/10/2009 | 3/11/2009 | 3/11/2009 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide a hydro test for the new portion of the sprinkler system since it includes 22 sprinkler heads and can be isolated. Provide as-builts showing the piping changes and the additional pendants in the remote area. Replace the flat face(hex)bushings and provide on piece reducing fittings. Provide access to the inside of the coolers to verify storage heights and sprinkler obstructions. Provide verification of the annual inspection on the sprinkler system.
|
INSP-Sprinkler Rough-in | 2/5/2009 | 2/6/2009 | 2/5/2009 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|