INSP-Sprinkler Rough-in/Hydro | 5/19/2009 | 5/20/2009 | 5/20/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/19/2009 | 5/20/2009 | 5/20/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/14/2009 | 5/15/2009 | 5/15/2009 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 4/14/2009 | 4/15/2009 | 4/15/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed
|
INSP-Sprinkler Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Troy Cobbley
|
|
|
The thrust block at the 45 has been replaced and the remaining underground piping can be covered.
|
INSP-Sprinkler Rough-in | 3/18/2009 | 3/19/2009 | 3/23/2009 | P | PASS |
Troy Cobbley
|
|
|
The thrust block at the 45 has been replaced and the remaining underground piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 3/19/2009 | 3/20/2009 | 3/20/2009 | A | FAIL |
Forrest France
|
|
|
Thrust block at the 45 deg ell is not satisfactory, noted one section of piping needs properly bedded, remiander of installation is okay for cover-see plans for locations approved for bury.
|
INSP-Final Inspection | 2/26/2009 | 2/27/2009 | 2/26/2009 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 2/26/2009 at 2:54:20 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 26 2009 2:56PM.
|
INSP-Sprinkler Rough-in | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Troy Cobbley
|
|
|
The in building riser and 5'-0" stub out are ok to bury
|