The Fire Sprinkler Scope of work consists of adding a new preaction system for the data room.

(ECCO) Remodel to a portion of the existing 40,335 square foot first floor and a first time tenant improvement to the 9,230 square foot second floor. NOTE: This building is fully fire sprinklered for area increase. Work to the first floor to include: Adding new elevator, elevator equipment room constructed of 8" concrete smooth surface block on the exterior of the building , new Concore 2500 Access floor panel system in the server room, extending the existing server room walls to the underside of the second floor, construction of new walls for a lab area with a new door/tempered window, construction of new walls for a break room, and other misc. work per the plans. Work to the second floor to include: Construction of new walls for a new conference room, offices, mail room, smaller conference room, corridor with a breakroom/coffee station, one men's restroom, one women's restroom, one unisex restroom, and second floor framing construction for new HVAC and janitor/storage rooms. Second floor misc. work to include: New glass handrail, relocating a ducting chase, modifying the vestibule ceiling, sloping gypcrete flooring down to plywood floor landings at both stairs, and adding office cubicles. All work per approved plans, Engineering, attached Plan review report, and CZC08-00167. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/6/20095/6/20095/6/2009APASS
DetailsForrest France
Fire sprinkler permit work passed final inspection, alarm interconnections tested okay.
INSP-Sprinkler Rough-in/Hydro4/27/20094/28/20094/28/2009PPART
DetailsForrest France
Pressure testing for the new preaction system completed okay, per NFPA 13 pneumatic testing for the single interlock system is not required.
INSP-Sprinkler Rough-in/Hydro4/27/20094/27/20094/27/2009PPART
DetailsForrest France
Begin air testing at 3:00 pm @ 41.5 psig.
INSP-Sprinkler Rough-in/Hydro4/27/20094/27/20094/27/2009APART
DetailsForrest France
OH hydrostatic retest of the preaction system passed.
INSP-Sprinkler Rough-in/Hydro4/23/20094/24/20094/24/2009PFAIL
DetailsForrest France
Hydrostatic test for the new preaction system failed due to pressure loss at the guage per site inspection completed by T. Frost.
INSP-Sprinkler Rough-in/Hydro4/17/20094/17/20094/17/2009PNR
DetailsForrest France
INSP-Sprinkler Rough-in3/20/20093/20/20093/20/2009PFAIL
DetailsForrest France
See inspection comments per T. Frost.