INSP-Final Inspection | 7/2/2009 | 7/2/2009 | 7/2/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2009 | 5/6/2009 | 5/5/2009 | A | CANC |
Troy Cobbley
|
|
|
Rob Claborn Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/21/2009 | 4/21/2009 | A | CANC |
Troy Cobbley
|
|
|
The hydro test is being cancelled due to the locked united water valve
|
INSP-Supply line flush | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | FAIL |
Troy Cobbley
|
|
|
The United Water valve lock was still in place so the flush could not be completed.
|
INSP-Sprinkler Rough-in/Hydro | 4/20/2009 | 4/21/2009 | 4/21/2009 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2009 | 4/13/2009 | 4/13/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground piping is ok for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/9/2009 | 4/10/2009 | 4/10/2009 | A | FAIL |
Troy Cobbley
|
|
|
The city approved plans were not at the job site so no inspection was performed.
|