Permit Information
Permit NumberFIR09-00179
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1675 S MAPLE GROVE RD
Project NameCommunity Connection - Bld A
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of a wet system protecting a new building. The building is one floor with an attic. The system is located in the attic with two levels of protection. One level protection is for the below system. One level of protection is for the attic utilizing attic sprinklers.

Community Connection - Building A - To construct a new 7,800 square foot, one story, wood framed office building and related site improvements. The tenant is a limited office use consisting of instructional independence learning and physical therapy for handicapped individuals. This building will contain play rooms, therapy rooms, offices, conference rooms, reception and waiting area, restrooms, break room and lunch room. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. DRH07-00579 JCM NEED RP PRIOR TO ISSUANCE.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/28/20095/29/20095/29/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection5/27/20095/28/20095/28/2009PFAIL
DetailsTroy Cobbley
The alarm interconnections need to be tested. The forward flush of the backflow needs to be performed. The backflow as installed does not match the riser detail on the city approved drawings. Contact the plan reviewer to verify if the new backflow will be adequated to remain. Contractor still needed to install a sidewall sprinkler head.
INSP-Sprinkler Rough-in/Hydro5/20/20095/20/20095/20/2009PPASS
DetailsTroy Cobbley
The above ground hydro test passed. The sprinkler piping above the layin tile can be coverd.
INSP-Sprinkler Rough-in4/29/20094/30/20094/30/2009APASS
DetailsTroy Cobbley
The piping above the mezzanine can be covered. The insulation is not completely installed and will require another inspection. I found where the AP upright sprinkler heads are not within their listed distance from the deck, 1"-3", as per the data sheet. Also the AP heads need to be within 5'-0" of the exterior walls as per the detail provided on the city approved plans. The insulation is blocking the spray of the upright heads beneath the mezzanine as well.
INSP-Sprinkler Rough-in4/23/20094/23/20094/23/2009PPART
DetailsTroy Cobbley
See the city approved plans for the piping locations above the hard lid ceilings that are ok to cover. Per discussion with Leroy and Christina the remaining rough-in inspection will be called in next week when the earthquake bracing, wire branchline restraints and insulation at the deck have been installed.