Permit Information
Permit NumberFIR09-00239
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1675 S MAPLE GROVE RD
Project NameCommunity Connection - Bld B
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of a wet system protecting a new building. The building is one floor with an attic. The system is located in the attic with two levels of protection. One level protection is for the below system. One level of protection is for the attic utilizing attic sprinklers.

Community Connection - Building B - To demolish and remove an existing single family dwelling and other out buildings; and to construct a new 7,670 square foot, one story, wood framed office building and related site improvements. The tenant is a limited office use consisting of instructional independence learning and physical therapy for handicapped individuals. This building will contain teen rooms, adult room, recreation room, therapy rooms, offices, conference rooms, reception area, restrooms, break room and lunch room. There is a 1,165 square foot, unfinished area for future expansion. The future unfinished area will require a separate tenant improvement permit to finish for occupancy. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. DRH07-00579 JCM NEEDS RP PRIOR TO ISSUANCE.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/26/20096/29/20096/29/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection6/24/20096/26/20096/26/2009AFAIL
DetailsTroy Cobbley
Provide the required clearance around the underground stub-in supply riser. Forward flush passed. All other items are passed.
INSP-Sprinkler Rough-in/Hydro6/2/20096/3/20096/3/2009APASS
DetailsTroy Cobbley
The overhead hydro test passed. All piping can be covered except the pipe just south of the main entrance due to insulation that is hanging from the roof deck acting as an obstruction to the attic sprinklers.
INSP-Sprinkler Rough-in5/11/20095/12/20095/12/2009APASS
DetailsTroy Cobbley
Todays inspection was for cover of the sprinkler piping above the mezzanine only.
INSP-Sprinkler Rough-in5/7/20095/7/20095/7/2009PPASS
DetailsTroy Cobbley
Sprinkler piping above the hard lid areas are okay to cover.