INSP-Final Inspection | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The panel was replaced with the model that was submitted on. The Netcon was a 5.
|
INSP-Final Inspection | 7/8/2010 | 7/8/2010 | 7/8/2010 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow due to micron plan review today.
|
INSP-Final Inspection | 7/1/2010 | 7/2/2010 | 7/2/2010 | P | CANC |
Troy Cobbley
|
|
|
Give Randy a call ###-####. Inspection requested from web by: Mike Brown Phone #: ###-#### Inspection cancelled from web by: Mike Brown
|
INSP-Final Inspection | 6/30/2010 | 6/30/2010 | 6/30/2010 | P | FAIL |
Troy Cobbley
|
|
|
The model of Aes installed does not match what was submitted. Also an intella tap has been installed which is not shown on the plans. I told Randy that this once I would accept this as an as-built but all other would need to resubmitted as previously discussed on the last inspection.
|
FIR-Aging Inspection | 9/7/2009 | 9/7/2009 | 9/10/2009 | | NR |
Troy Cobbley
|
|
|
work is in progress per david
|