INSP-Final Inspection | 10/27/2009 | 10/28/2009 | 10/28/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed, correction items finished, permit final approved.
|
INSP-Sprinkler Rough-in | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PART |
Forrest France
|
|
|
Final pending ceiling tile, escutcheons, hydrostatic test, C/N items.
|
INSP-Sprinkler Rough-in/Hydro | 10/14/2009 | 10/15/2009 | 10/15/2009 | P | CANC |
Troy Cobbley
|
|
|
Cancel per tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | PART |
Forrest France
|
|
|
Remainder of overhead work okayed for cover with the exception of two locations clouded on plans including the one upright at the server room to be relocated and an overspaced head due to floorplan changes at the locker area.
|
INSP-Sprinkler Rough-in | 10/5/2009 | 10/5/2009 | 10/5/2009 | A | PART |
Forrest France
|
|
|
See stamped plan set for areas okayed for cover to date.
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PART |
Forrest France
|
|
|
Ok to cover perimeter rooms per plan annotations circled and initialed marked with today's date.
|
INSP-Sprinkler Rough-in | 9/21/2009 | 9/21/2009 | 9/22/2009 | P | PART |
Forrest France
|
|
|
Overhead rough-in at the board room, file room and reception area as marked on the stamped plan set are good for cover at the sheetrock ceilings. Breakroom partial cover okayed as one branchline is incomplete.
|