Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR09-00424
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1951 S SATURN WAY Unit: 100
Project NameAmalgamated Sugar Co.
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of relocating sprinklers to accommodate a new ceiling and wall configuration. The existing system is a 2 ½"x2"x1 ¼" grid. In addition, a new double interlock preaction system will be installed to protect a computer room. Two branch lines are being rerouted around the new computer room.

(AMALGAMATED SUGAR COMPANY) Remodel for a 23,116 sq. ft. tenant in an existing building to include demolition of existing office areas and construction of new office layout. Existing lay-in ceiling to remain where possible, new interior finishes where required with minor exterior storefront work per approved plans. Work to include: construction of interior partitions creating; individual office areas, open office area, small conference rooms, computer room, board room, training room, storage area, break room, and reception areas. Installation of a suspended ceiling system, installation of new HVAC unit, miscellaneous related interior finishes, fire sprinkler work, new mechanical, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. CZC09-00127 **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/25/20098/26/20098/26/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection8/25/20098/26/20098/26/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in8/20/20098/21/20098/21/2009APASS
DetailsTroy Cobbley
Sprinklers ok to cover
INSP-Sprinkler Rough-in/Hydro8/12/20098/13/20098/13/2009APASS
DetailsTroy Cobbley
The 24 air test passed.
INSP-Sprinkler Rough-in8/12/20098/12/20098/12/2009PPASS
DetailsTroy Cobbley
The 24 hour air test was started at 11:00 with 43 psi on the guage.
INSP-Sprinkler Rough-in/Hydro8/11/20098/11/20098/11/2009PPASS
DetailsTroy Cobbley
The overhead hydro test of the new pre-action system passed.
INSP-Sprinkler Rough-in8/7/20098/7/20098/7/2009PFAIL
DetailsTroy Cobbley
No city approved drawings were on site for the inspection.