Permit Information
Permit NumberFIR09-00482
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 7311 W POTOMAC DR
Project NameBOISE POLICE ASSOCIATION
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of providing fire protection to the first floor of an existing building and to modify the existing basement floor fire protection. A new 4" yard PIV will be installed into the existing 4" underground. All sprinklers in the basement will be replaced with QR type.

Fire Work (Plan Mod) Scope:
Change underground to 6" DI. There were minor changes from reviewed plans in a number of different areas. All changes are ballooned on the plans. Hydraulics were changed, see below. ONLY the ballooned areas were reviewed.

(BOISE POLICE ASSOCIATION - CLUBHOUSE AND EVENT CENTER) A fire sprinkler system is required to be installed throughout this building. To convert an existing 13,087 square foot office building (12,437 square feet inside and 650 square feet outside) to an event center. The basement has a total floor area of about 6,227 square feet and the 1st story has a total floor area of about 6,860 square feet (6,210 square feet inside and 650 square feet outside). The work is to include 4 restrooms accessible to the disabled, an interior bearing wall in the basement with a new concrete footing, altered open web floor trusses to shorten their span, two glu-lam roof beams, a tube steel column, and interior finishes. Special inspection is required for welding and for the modifications to the open web floor trusses. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. In conjunction with this permit, this building is required to be fully fire sprinklered per NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/23/200910/26/200910/27/2009PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Sprinkler Rough-in/Hydro10/22/200910/23/200910/23/2009APASS
DetailsTroy Cobbley
The overhead hydro and verification of previous corrections passed. I went over items needed for the final such as fire alarm interconnections, signage at the riser, forward flow verification.....ect.
INSP-Sprinkler Rough-in/Hydro10/22/200910/22/200910/22/2009PCANC
DetailsTroy Cobbley
Overbooked. Rescheduled with Joe for tomorrow morning.
INSP-Supply line flush10/20/200910/21/200910/21/2009APASS
DetailsTroy Cobbley
The underground supply flush passed inspection.
INSP-Supply line flush10/16/200910/19/200910/19/2009ACANC
DetailsTroy Cobbley
Canceled per Joe until the backflow preventor is removed.
INSP-Sprinkler Rough-in/Hydro10/16/200910/19/200910/19/2009APASS
DetailsTroy Cobbley
The underground hydro test passed. The amount of water lost was verified ok against the amount allowed in NFPA 13.
INSP-Supply line flush10/19/200910/19/200910/19/2009PCANC
DetailsTroy Cobbley
we would like to follow the previously scheduled hydro with this flush. Phone #: ###-#### Internet Inspection Request from: Scott Carter II Inspection cancelled from web by: Scott Carter II
INSP-Sprinkler Rough-in/Hydro10/19/200910/19/200910/19/2009PCANC
DetailsTroy Cobbley
underground hydro. please call 1 hour prior to inspection. Thank you Phone #: ###-#### Internet Inspection Request from: Michelle Carter Inspection cancelled from web by: Scott Carter II
INSP-Sprinkler Rough-in10/2/200910/5/200910/5/2009APASS
DetailsTroy Cobbley
The new PIV piping can be covered.
INSP-Sprinkler Rough-in/Hydro10/1/200910/2/200910/2/2009PPART
DetailsTroy Cobbley
Todays inspection completed the first floor high area which is ok to cover but the piping addition will need to be shown on the resubmittals. I also inspected the basement which will need to be resubmitted due to changes and overspaced pendants. The pendants have been calculated for 121 square feet per head but many exceed that. I gave the ok to cover on the piping over the offices along the north basement wall but head spacing will have to conform to the resubmitted plans when approved. The underground pipe type and size does not match approved plans. I asked Trent to please reflect the changes on the resubmittals.
INSP-Sprinkler Rough-in/Hydro10/1/200910/2/200910/1/2009ACANC
DetailsTroy Cobbley
Please call 15 min prior to insppection Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in9/29/20099/30/20099/30/2009PPART
DetailsTroy Cobbley
Today's inspection only covered the first floor piping. First floor piping can be covered except the piping in the central high area. This is because an additional branch line and upright sprinkler heads have been added in this area which is remote area #1 and may require modifications to the hydraulic calculations. Also, the upright sprinkler heads in this area shown on the plan were to be an 11.2 K factor. The upright heads installed are 5.6 K factor. See plans for a single wall location that is blocking upright sprinkler coverage. Access needs to be provided to the interior of the exterior canopies for verification of correct dry sidewall sprinkler head installation. The basement system has not been inspected due to time constraints.