INSP-Final Inspection | 2/23/2010 | 2/24/2010 | 2/24/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Forward flush passed.
|
INSP-Final Inspection | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | NR |
Forrest France
|
|
|
Partial inspection- Noted three obstructed pendent heads- one each at a storage room, isolation room, and detox room, need to complete forward flow test, missing the cover at the flow switch, two curtains at the womens sleep room are not installed, project related fire alarm permit is not yet finaled- however sprinkler riser monitoring tested okay.
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed.
|
INSP-Sprinkler Rough-in | 2/1/2010 | 2/1/2010 | 2/1/2010 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the gridded areas can be covered except for the small room with a grid ceiling in the west end of the building.
|
INSP-Sprinkler Rough-in | 12/30/2009 | 12/30/2009 | 12/30/2009 | P | PASS |
Troy Cobbley
|
|
|
See the lasted version of the city approved plans for additional areas where the hardlid ceilings can be installed and cover the sprinkler piping.
|
INSP-Sprinkler Rough-in | 12/15/2009 | 12/16/2009 | 12/16/2009 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional rooms where piping is approved for cover. I spoke to the sprinkler fitter Scott and the project superintendant with EKC about the need for the plans to be resubmitted and the possibility of a stop work order if piping was covered in rooms that had not been approved for cover. All parties agreed the plans would be resubmitted immediately.
|