INSP-Final Inspection | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The duct smoke detectors have been removed from the supply side of the hvac units by the mechanical contractor and the duct smoke detectors have been removed off of the hvac unit located in northeast corner of the building. This unit was rated at 1850cfm per the mechanical contractor.
|
INSP-Final Inspection | 9/4/2009 | 9/8/2009 | 9/8/2009 | A | FAIL |
Troy Cobbley
|
|
|
The hvac unit in the northeast corner of the building has two duct smoke detectors that are not connected to the existing fire alarm system as required per IFC 907.12. There is also a hvac unit located in the center of the building that has a duct smoke detector located on the supply side that is not connected to the existing fire alarm system as per IFC 907.12. The remaining units tested ok for shutdown and reported to the central station. A re-inspection fee is being added for the upcoming fourth inspection.
|
INSP-Final Inspection | 9/3/2009 | 9/4/2009 | 9/4/2009 | A | FAIL |
Troy Cobbley
|
|
|
The hvac units did not shutdown when the duct smoke detector went into alarm. A re-inspection fee for the next inspection, the third, has been applied.
|
INSP-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 | P | FAIL |
Troy Cobbley
|
|
|
I left a message with the fire alarm contractor at 12:30 that I was headed towards the project site for the inspection. I left at 1:00 after no contact other than the store manager. No inspection was performed.
|