INSP-Final Inspection | 12/1/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Forrest France
|
|
|
Remainder of fire sprinkler work and correction item verified for completion, fire sprinkler permit okay for final.
|
INSP-Final Inspection | 9/29/2009 | 10/1/2009 | 10/1/2009 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the drop ceilings are okay for cover, noted one additional head to be changed to match response/type of existing sprinklers. Final pending ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 9/22/2009 | 9/23/2009 | 9/23/2009 | A | PART |
Forrest France
|
|
|
See approved plan set for annotations indicating areas okay for cover, ceiling grid and drops are not yet installed at some locations, new heads must match response type of existing.
|