INSP-Final Inspection | 2/9/2010 | 2/10/2010 | 2/10/2010 | P | PASS |
Forrest France
|
|
|
Verified plan resubmittals, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 2/1/2010 | 2/3/2010 | 2/3/2010 | P | PART |
Forrest France
|
|
|
Final pending updated plans for field modifications beyond scope of original permit work. Installation appears satisfactory, rough-in passed.
|
FIR-Aging Inspection | 1/1/2010 | 1/1/2010 | 1/6/2010 | | DEFR |
Forrest France
|
|
|
Pending site inspection request.
|