INSP-Final Inspection | 3/3/2010 | 3/4/2010 | 3/4/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed and the branchline restraints have now been added.
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | PART |
Troy Cobbley
|
|
|
I finished the rough-in inspection in the previously locked tenant space. I started the above ground hydro test but Brian called me later and stated that he had lost pressure and we would need to reschedule.
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | PART |
Troy Cobbley
|
|
|
The basic rough-in is passed. Branchline restraints are missing and there was no access to one tenant space to inspect the new main. No hydro test was performed today.
|
INSP-Supply line flush | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Supply line flush | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | CANC |
Troy Cobbley
|
|
|
The underground flush is to be rescheduled per Brian.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok for cover.
|
INSP-Sprinkler Rough-in | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for the additional underground supply piping that is ok to cover.
|
INSP-Sprinkler Rough-in | 11/3/2009 | 11/4/2009 | 11/3/2009 | A | PART |
Troy Cobbley
|
|
|
The first 80'-0" feet fo 6" underground supply piping is ok to cover. The original stamped plans were not on site but will be tomorrow per Brian.
|