Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR09-00608
StatusFinaled
Name SNAKE RIVER ELECTRIC INC
Site Address 2822 S VISTA AVE
Project NamePacific Cataract & Laser Insti
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide a new fire alarm panel for sprinkler system and HVAC monitoring. Also included in this permit scope are a non-required manual system and a non-required partial coverage automatic detection system. By providing the manual and automatic detection systems, full notification coverage is required.

Associated building permit: BLD09-00287 Pacific Cataract & Laser Institute - To construct a new 9,365 square foot, one story with 1,285 square foot mechanical mezzanine, wood framed medical office building (outpatient eye clinic) and related site improvements. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/10/20102/10/20102/10/2010PPASS
DetailsForrest France
Fire alarm permit final approved.
INSP-Final Inspection2/9/20102/9/20102/9/2010PPART
DetailsForrest France
Correction notice items verified for completion, remainder of alarm work passed site testing. Final pending offsite monitoring check via permit FIR09-00740. Contractor to provide missing signage at the door to the FACP room.
INSP-Final Inspection2/5/20102/5/20102/9/2010PNR
DetailsForrest France
Pending modifications per previous inspection- not ready 2/5 per phone call from contractor.
INSP-Final Inspection2/4/20102/4/20102/4/2010PFAIL
DetailsForrest France
Smoke detectors at three locations are too close to HVAC diffusers, missing one SD address D1-13, HVAC units must shut down immediately upon duct smoke activation. Fire sprinkler riser supervision tested okay, five MP stations, battery trouble, open circuts, and notification circuts all passed functional testing. Offsite monitoring to be verified under project related FIR permit inspection. Plan resubmittals verified.