Permit Information
Permit NumberFIR09-00622
StatusFinaled
Name ALLIED GENERAL FIRE & SECURITY
Site Address 7031 S EISENMAN RD
Project NamePower Bar
Customer Number 
ePlanReview 
Description
This fire alarm permit is to replace the existing fire alarm panel and components with all new. Manual system shall include pull stations, full notification, and HVAC & Sprinkler system monitoring. There are some areas with voluntary partial coverage.

Associated building permit: BLD09-01820 (Power Bar) Permit for the remodel of 8,389 sq.ft. area within an existing 187,820 tenant space, expanding the production area which includes the removal of some office area. Infill of some existing doors, new suspended ceiling and lighting in the production area and the construction of a green room. All work to be done per the approved plans. Any racking over 8 feet in height requires a separate racking permit. This is a fully sprinkled building; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by Boise City Fire Department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/22/20101/22/20101/22/2010PPASS
DetailsForrest France
Correction notice items verified for completion, as-built drawings recieved. Final fire alarm inspection passed, permit final approved.
INSP-Final Inspection12/29/200912/31/200912/31/2009AFAIL
DetailsForrest France
Flow switches at risers #4 and 5 did not function, outside bell did not operate, provide weatherproof devices at the shower rooms, post a listing of account activity with today's date for signals sent at next inspection, provide record drawings indicating field modifications/address changes etc. Remainder of items tested okay include heat and smoke detectors, nac panels, EOL's, relay for mag locks, notification throughout, risers 1thru 3.
INSP-Final Inspection12/24/200912/29/200912/29/2009APART
DetailsForrest France
Duct detectors at the new production area passed testing, mag lock at the main entry/exit needs repair, coordinated notification testing for 12/31 per discussion.
INSP-Final Inspection12/24/200912/28/200912/28/2009APART
DetailsForrest France
Completed testing for duct detectors at areas A , F and mezzanines, retest DD at area D tool crib and area B office passed, incorrect sample tube orientation at AHU 28 fixed while on site, manual pull stations throughout tested okay, tamper switches at the sprinkler riser okayed, need to verify correct test orfice sizes at riser manifold prior to flow switch testing, two duct detectors at the Jenny Craig production line lacking access due to floor finishes underway, verified missing a/v has been installed at area D warehouse, relay for mag locks at the main entry is not ready for testing per contractor.
INSP-Final Inspection12/23/200912/24/200912/24/2009APART
DetailsForrest France
Completed duct detector testing at the production areas- see plan sheets areas E and F for annotations, incorrect sample tube orientation at address 16 repaired while on site.
INSP-Final Inspection12/18/200912/23/200912/23/2009AFAIL
DetailsForrest France
Completed functional testing of duct detectors at office areas A and B, HVAC unit at the NW corner office area "A" failed to shut down (address 92), obstructed vent tubes at two locations repaired while on site, see plans for devices tested to date, discussed inspection schedule, noted some previous c/n items are incomplete.
INSP-Final Inspection12/18/200912/22/200912/22/2009APART
DetailsForrest France
Completed satisfactory testing of duct detectors in areas D and C with the exception of one HVAC unit (address 58) which failed to shut down upon smoke detector activation.
INSP-Final Inspection12/18/200912/21/200912/21/2009AFAIL
DetailsForrest France
Missing one notification appliance at the warehouse Area C, one cd setting at the ramp is incorrect, need access to the laundry room and company store for functional testing, notification at some areas including the tool crib and mixing room appears to be obstructed, non-functional existing FA system devices to be removed. Two duct detectors at area C warehouse passed testing.
INSP-Final Inspection12/16/200912/18/200912/21/2009AFAIL
DetailsForrest France
Items noted during initial walkthrough include: mag locks at the main entry need interconnected to the fire alarm system, one overspaced manual pull station, notification appliances at five locations have insufficient candella settings including the tech. services room, one conference room, sanitation room, one office NW corner per red line review comments, and the new mixing room, strobes at the west hall office area are overspaced, missing signage at the FACP room door, missing a notification appliance at the reimelt room, noted several existing fire alarm devices connected to the old panel in need of removal as they are no longer functional, stamped drawings do not indicate FACP and security panel interconnection, lacking notification coverage at the shower areas in both the womens and mens locker rooms.