Permit Information
Permit NumberFIR09-00635
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 7808 W FAIRVIEW AVE
Project NameDEPT OF HEALTH & WELFARE
Customer Number 
ePlanReview 
Description
8/31/10 PLAN MODIFICATION: - 0 initiating devices affected
This plan modification is to incorporate field modifications and review comments for the notification devices.

11/10/09 This fire alarm permit is to provide audible/visible notification to new public and/or common use areas created by the tenant remodel and to maintain audibility throughout any altered areas. Devices are to be connected to previously installed remote power supply. No initiating devices are part of this permit scope.

Associated building permit: BLD09-00945 (IDAHO DEPARTMENT OF HEALTH AND WELFARE) (INTERIOR REMODEL) (SOUTH BUILDING) Fire sprinklers used for building area increase and for code trade-offs. To remodel the interior of an existing 73,639 square foot building for the current tenant. Several existing restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, finishes, and an exterior ramp. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire sprinkler system is required to be upgraded to comply with current standards, including quick-response sprinklers, in order to avoid enclosed 1-hr fire-resistance-rated corridors. Elements of the existing fire sprinkler system that already comply with current standards may remain without upgrade. This building remodel will be done in phases. Occupancy of a completed phase shall be coordinated with the Structural Inspector and Fire Inspector. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/7/20109/8/20109/8/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection9/1/20109/3/20109/3/2010AFAIL
DetailsTroy Cobbley
Provide approved map with all required information and mount at the facp.
INSP-Alarm Testing5/14/20105/14/20105/14/2010PDONE
DetailsTroy Cobbley
Fire sprinkler risers #2 and #3 inspected today. Flow switches and tamper switches functioned correctly. These items are not shown on the fire alarm plans and will need to be included when the plan modifications are submitted prior to a final sign off.
INSP-Alarm Testing4/20/20104/21/20104/20/2010ACANC
DetailsTroy Cobbley
If possible could we get before 8:00am. Nick is the contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Alarm Testing4/19/20104/20/20104/19/2010ACANC
DetailsTroy Cobbley
Nick is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Alarm Testing4/15/20104/16/20104/15/2010ACANC
DetailsTroy Cobbley
Nick is the onsite contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Alarm Testing3/23/20103/24/20103/24/2010APASS
DetailsTroy Cobbley
The lobby area horn/strobes of phase 6 functioned correctly.
INSP-Alarm Testing3/22/20103/23/20103/23/2010APASS
DetailsTroy Cobbley
The phase 8 existing fire alarm horns operated. We found that the new a/v's in the main lobby had not been inspected or connected to the NAC panel.
INSP-Alarm Testing12/3/200912/3/200912/3/2009PDONE
DetailsTroy Cobbley
Phase 4 fire alarm installation and testing is complete.
INSP-Final Inspection12/2/200912/3/200912/3/2009AFAIL
DetailsTroy Cobbley
This inspection is for phase 4. One additional horn/strobe needs to be installed as per the approved plans. Also horn only devices were not installed in the right hand corridor system of phase 4 as per the plans. Either re-install the horns or provide code compliant coverage through out the entire space served by the corridor system which includes the Lobby area.