INSP-Final Inspection | 5/7/2010 | 5/10/2010 | 5/10/2010 | A | PASS |
Forrest France
|
|
|
Temporary partition has been removed, fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in | 12/30/2009 | 12/31/2009 | 12/31/2009 | A | FAIL |
Forrest France
|
|
|
Existing heads outside the new production area wall to the south side are overspaced and were to be relocated per approved drawings, overhead modifications at the "green room" and adjacent control room are not included in the scope of work, noted one pendent sprinkler head at the green room is supplied by a drop with an in-line ball vavle with the handle removed, outside bell failed to operate, flow switches at risers #4 and 5 did not function. Celing cover okayed at the new sifting room and the jenny craig production area.
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2009 | 12/30/2009 | 12/30/2009 | A | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow
|
INSP-Sprinkler Rough-in | 12/29/2009 | 12/30/2009 | 12/29/2009 | A | DEFR |
Forrest France
|
|
|
Need to schedule a rough-to-cover at Power Bar. Scott is the contact @ ###-####. Please call him at least 1 hour before inspection to ensure someone will be there. Your time and attention is appreciated. Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
INSP-Final Inspection | 1/22/2010 | 1/25/2010 | | A | |
Forrest France
|
|
|
trent Phone #: ###-####
|