Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR09-00706
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project NameSupervalu
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers to accommodate new wall and ceiling configurations. The existing system is a 3"x2½"x1½" grid.

(Supervalu - General Office 1st Floor TI - Phase A) FPP Remove selected walls, doors, and finishes to accommodate new walls on the first floor south end of the building, removing office space to create three storage areas and non-combustible wall partitions with bracing. No lighting will be added, minor electrical work. Relocation of mechanical ductwork will be inspected by the building inspector. Any fire sprinkler or alarm work will require a fire permit issued by fire plan review to meet NFPA. 13
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/25/20101/25/20101/25/2010PPASS
DetailsForrest France
Corrections verified for completion, final walkthrough passed, fire sprinkler permit finaled.
INSP-Final Inspection12/30/200912/31/200912/31/2009APART
DetailsForrest France
Correction notice items field verified for completion, fire sprinkler work is approved for ceiling cover at the remodel area per permit documents.
INSP-Conference12/30/200912/30/200912/30/2009ADONE
DetailsForrest France
Regarding correction items and adjustments in sprinkler head locations necessary for code compliance.
INSP-Final Inspection12/29/200912/29/200912/29/2009PFAIL
DetailsForrest France
See plan annotations and highlighted areas in need of revision including overspaced heads, one obstructed area, and two locations which exceed min. spacing.