INSP-Final Inspection | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PASS |
Forrest France
|
|
|
Corrections verified for completion, final walkthrough passed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/30/2009 | 12/31/2009 | 12/31/2009 | A | PART |
Forrest France
|
|
|
Correction notice items field verified for completion, fire sprinkler work is approved for ceiling cover at the remodel area per permit documents.
|
INSP-Conference | 12/30/2009 | 12/30/2009 | 12/30/2009 | A | DONE |
Forrest France
|
|
|
Regarding correction items and adjustments in sprinkler head locations necessary for code compliance.
|
INSP-Final Inspection | 12/29/2009 | 12/29/2009 | 12/29/2009 | P | FAIL |
Forrest France
|
|
|
See plan annotations and highlighted areas in need of revision including overspaced heads, one obstructed area, and two locations which exceed min. spacing.
|