Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR09-00707
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4610 W HILLCREST DR
Project NameHillcrest Country Club
Customer Number 
ePlanReview 
Description
**Plan Modification Adding, four sprinklers to remote area four and one sprinkler to remote area 2. New hydraulics were provided.**
Original Fire Work Scope: The Fire Sprinkler Scope of work consists of renovating an existing fire protection system to accommodate new wall and ceiling configuration. The existing fire protection system will be extended to provide sprinklers in two new additions. The fire protection consists of above and below protection. There are two levels in this building each level has a separate riser. The construction has been divided into two phase. The entire building is to have fire protection. In most of the existing areas, the sprinklers are being changed to quick response type.

Hillcrest Country Club - Phase I Addition and Remodel - Phase I includes remodel of the entire building on the west side of the fire wall, plus 750 square feet on the east side of the fire wall (everything west of grid line S). To demo and remove the structure at the Garden Court areas. To demo and removed most of the interior partitions, ceilings and finishes, except at Mech/Elect Room #124 and the stairways. Demo and remove a large portion of the west exterior wall, planters and exterior stairways. To construct a new 4,150 sq. ft. basement and 3,875 sq. ft., wood framed first floor addition on the west end of the existing club house building. To construct new covered patio and entry areas. To refinish the interior to include new men's and women's lounges, showers, locker rooms and restrooms, new golf shop, fitness area, kitchen and bar/dining area. There is a two-hour, masonry firewall constructed at grid line Q. The area of the Phase I project is 18,900 square feet with a 11,900 square foot basement. This building is fully fire sprinkled. The sprinklers are used for area increase. The area on the west side of the firewall is 18,150 sq. ft. with an 11,900 sq. ft. basement; the area on the east side of the fire wall is 21,710 sq. ft. with a 1,535 sq. ft. basement. This permit is for Phase I of the project only. A separate tenant improvement permit will be required to finish Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/22/20107/26/20107/26/2010APASS
DetailsTroy Cobbley
The forward flush passed. Permit for Phase I passed.
INSP-Final Inspection5/25/20105/26/20105/26/2010AFAIL
DetailsTroy Cobbley
The alarm interconnection for the devices located in phase I were tested today. It appears the only outstanding item for phase I is the forward flush failed.
INSP-Sprinkler Rough-in5/20/20105/21/20105/21/2010APART
DetailsForrest France
Walkthrough of phase one completed, noted one head at the kitchen area out of adjustment, missing escutcheon at one dry pendent north side entry, one room at the first floor is missing a ceiling at this time. Remainder of inspection passed, final pending fire alarm testing for riser supervision.
INSP-Sprinkler Rough-in5/14/20105/14/20105/14/2010PPASS
DetailsTroy Cobbley
The fire sprinklers are complete in the pool/shower area.
INSP-Sprinkler Rough-in5/5/20105/5/20105/5/2010PPASS
DetailsTroy Cobbley
The pendants/piping in the corridor at the pool area is ok for cover.
INSP-Sprinkler Rough-in/Hydro5/4/20105/4/20105/4/2010PPASS
DetailsTroy Cobbley
The overhead hydro test for all of the new sprinkler piping passed. Also see the city approved plans for additional areas where sprinkler piping can be covered.
INSP-Sprinkler Rough-in/Hydro3/31/20104/1/20104/1/2010APASS
DetailsTroy Cobbley
The sprinkler rough-in and the hydro test for the basement area. This includes the anti-freeze loop.
INSP-Sprinkler Rough-in3/26/20103/26/20103/26/2010PPASS
DetailsTroy Cobbley
see the city approved plans for piping the is ok for cover.
INSP-Sprinkler Rough-in3/18/20103/19/20103/19/2010APART
DetailsForrest France
Pendent head at the locker room vestibule hard lid ceiling is okay for cover- see clouded area with today's date and initials on approved plan set sheet FP-4.
INSP-Sprinkler Rough-in3/16/20103/17/20103/17/2010APART
DetailsForrest France
See stamped plan set sheet FP-4 for clouded area initialed and marked with today's date for locations of overhead work at sheetrock ceilings okayed for cover. Missing coverage at one adjacent vestibule to be verified prior to cover and not included in this inspection.
INSP-Sprinkler Rough-in/Hydro3/10/20103/10/20103/10/2010PPASS
DetailsTroy Cobbley
The overhead hydro tests of the new west end wet system piping and the anti-freeze system/south canopy passed. The combustible concealed pockets on the previous correction notice have been provided with sprinkler coverage and can be covered as marked ok on the city approved plans.
INSP-Sprinkler Rough-in3/2/20103/3/20103/3/2010APASS
DetailsTroy Cobbley
See the city approved plans for locations where rough-in inspection passed and other areas marked "ok" where piping can be covered. I noted atleast two locations where a combustible concealed area existing that has no sprinkler protection and a location where a pendant head symbol is used on the plans but is not included in the head symbol legend. John is following up with the design department.
INSP-Sprinkler Rough-in3/2/20103/2/20103/2/2010PCANC
DetailsTroy Cobbley
John was not quite ready for inspection when I was available so we've rescheduled for first thing tomorrow morning.
INSP-Sprinkler Rough-in2/25/20102/25/20102/25/2010PPART
DetailsForrest France
Antifreeze system piping at the west canopy as marked on approved plan set with todays date and initialed okay for cover, one minor adjustment made while on sie, also okayed insulation fill at perimeter soffits on the new porte cochere.
INSP-Sprinkler Rough-in2/22/20102/22/20102/22/2010PPASS
DetailsTroy Cobbley
The modified underground supply piping is ok to cover. The old supply line has been capped off and abandoned.
INSP-Sprinkler Rough-in2/18/20102/19/20102/19/2010APASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered. They have been marked in red.
INSP-Sprinkler Rough-in2/18/20102/18/20102/18/2010PCANC
DetailsTroy Cobbley
Cancelled due to time constraints. Rescheduled with John Phone #: ###-#### for tomorrow morning.
INSP-Sprinkler Rough-in2/8/20102/9/20102/9/2010APASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered.
INSP-Sprinkler Rough-in1/28/20101/28/20101/28/2010PPART
DetailsTroy Cobbley
See the city approved plans for locations marked "ok" in red where piping can be covered. Part of todays inspection included the new system at the west end of the building. Here I found at least two additional sprinkler heads added in the remote area and per the plans the pendant heads in the attic area are mounted on the branchlines. As installed there are two 90 elbows and 1" piping between the branchline and the pendant heads. This occurs in the remote area. I spoke to John on site and Jeff in Treasure Valley Fires office about the need for resubmittals or at the very least contacting Tim Frost with plan review.
INSP-Sprinkler Rough-in1/25/20101/25/20101/25/2010PCANC
DetailsTroy Cobbley
Cancel this inspection per Jeremy since work was not complete. Plans were just issued today but an early start agreement was issued on 12-28-2009.