Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR09-00711
StatusFinaled
Name GUARDIAN ALARM SYSTEMS LLC
Site Address 350 S ALLUMBAUGH WAY
Project NameGrace @ Englefield Green
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide a new manual fire alarm system, automatic detection in corridors and areas open to corridors, notification throughout, door holder shutdown, hood; and monitoring for sprinkler system, HVAC, and dampers. Notification devices shown in sleeping rooms are to meet ADA requirements and are tied in to the building fire alarm system.

Associated building permit: BLD09-00557 (Grace @ Englefield Green - Assisted Living) Scope of work includes construction of a 66,772 sq. ft., single story, fully sprinklered, Type VA construction, divided by (4) 2-hour fire walls to create three buildings for allowable floor area compliance based on type of construction (11, 857 sq. ft. / 43,167 sq. ft. / 11,698 sq. ft.); with 85 supervised residential units (34 one bedroom units @ 528 sq. ft.; 37 Studio Units @ 388 sq. ft.; 2 two bedroom units @ 816 sq. ft.; 2 two bedroom units @ 780 sq. ft. and 4 Friendship Units @ 366 sq. ft.); use of 2-hour fire walls and (4) 1-hour smoke barrier walls create (5) smoke compartments; 1-hour smoke partitions to create a smoke resistant corridor system; a kitchen, dining and socializing area; laundry, mechanical and common use support areas. There are four interior courts (3,536 sq. ft. / 2,911 sq. ft. / 4,492 sq. ft. / 3,536 sq. ft.) that exit back through the facility; installation of electrical, mechanical, plumbing, sprinkler and alarm systems; and all associated site work and landscaping, all per reviewed plans to include red-line review notes and all attached plan review conditions / comments as part of the reviewed plans. Carports ARE NOT a part of this permit. They will require separate submittals. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/28/20106/1/20106/1/2010PPASS
DetailsTroy Cobbley
Permit finaled. Remaining deficiencies corrected.
INSP-Alarm Testing5/28/20105/28/20105/28/2010PDONE
DetailsTroy Cobbley
Relocate the a/v in the dining area, provide an additional strobe in the lobby and provide an additional strobe in the courtyard corridor as discussed and then test. Still need to verify operation of the remaining smoke dampers. Need map for facp and signal report
INSP-Alarm Testing5/26/20105/27/20105/27/2010ADONE
DetailsTroy Cobbley
See the city approved plans for the initiating devices theat are marked with OK thant have been tested. This included phone line troubles, verification of separate phone lines, duct smoke detectors, pull stations, smoke detectore and heat detectors. Items left to test include the fire sprinkler interconnections, smoke dampers, supervision of the NAC panels, EOL voltage verifications and verifications of a/v sync.. As-builts are also required reflecting actual locations of devices and devices that have been deleted.
INSP-Alarm Testing5/24/20105/25/20105/25/2010ACANC
DetailsTroy Cobbley
Per Matt the fire alarm system is not ready for inspection and will need to be rescheduled.
INSP-Conference3/12/20103/12/20103/12/2010PDONE
DetailsTroy Cobbley
I spoke to Matt about duct smoke detector placement and possible manometer testing to verify correct function of the detectors.
INSP-Conference1/19/20101/20/20101/20/2010ADONE
DetailsTroy Cobbley
The stop work order that had been previously posted for the fire alarm installation is being lifted due to the fire alarm plans being issued.